Turing Registry · TR-04349

GALEVIEW

Wind farm operations. Operated by Janssen Power.

Summary

Schedules maintenance and curtails turbines during bird migration at Janssen Power sites.

License conditions

  1. Turbines curtail automatically when protected birds are detected nearby.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed as the replacement for TR-03059.

  2. Renewal filed and approved.

  3. Renewal filed and approved with no change to scope.

  4. Renewal filed and approved.

  5. Renewal filed and approved after an independent evaluation.

  6. Renewal filed and approved with no change to scope.

  7. Renewal filed and approved after an independent evaluation.

  8. Renewal filed and approved.

Related filings

Also filed by Janssen Power

All 9 filings by this operator →