Turing Registry · TR-06570

NACELLE 9

Wind farm operations. Operated by Halloran Power.

Summary

Schedules maintenance and curtails turbines during bird migration at Halloran Power sites.

License conditions

  1. May not exceed manufacturer load limits to increase output.
  2. Turbines curtail automatically when protected birds are detected nearby.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for wind farm operations.

  2. Renewal filed and approved after an independent evaluation.

  3. Retired and replaced by TR-08609.

Related filings

Also filed by Halloran Power

All 9 filings by this operator →