Turing Registry · TR-08609

GALE 8

Wind farm operations. Operated by Halloran Power.

Summary

Controls blade pitch and yaw for 12 turbines at a wind farm near Westharrow.

License conditions

  1. May not exceed manufacturer load limits to increase output.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed as the replacement for TR-06570.

  2. Renewal filed and approved.

  3. Renewal filed and approved.

Related filings

Also filed by Halloran Power

All 9 filings by this operator →