Turing Registry · TR-06600

VOLTAGE 7

Electrical grid balancing. Operated by Red River Power Cooperative.

Summary

Balances supply and demand across a distribution network serving about 699 thousand customers in Bellton.

License conditions

  1. Hands control back to human operators within five seconds of any fault.
  2. Control actions above 36 MW require operator confirmation.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for electrical grid balancing.

  2. Renewal filed and approved.

  3. Renewal filed and approved.

  4. Software update notified to the Registry. Scope unchanged.

  5. Renewal filed and approved with no change to scope.

  6. Renewal filed and approved.

Also filed by Red River Power Cooperative

All 18 filings by this operator →