Turing Registry · TR-07043

SUBSTATION 5

Electrical grid balancing. Operated by Port Westcrest Electric.

Summary

Dispatches battery storage and demand response for Port Westcrest Electric, within limits set by the grid operator.

License conditions

  1. Control actions above 35 MW require operator confirmation.
  2. May not disconnect customers who depend on medical equipment.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for electrical grid balancing.

  2. Renewal filed and approved.

  3. Renewal filed and approved after an independent evaluation.

  4. Retired at the end of its service contract.

Also filed by Port Westcrest Electric

All 17 filings by this operator →