Summary
Dispatches battery storage and demand response for Port Westcrest Electric, within limits set by the grid operator.
License conditions
- Control actions above 58 MW require operator confirmation.
- May not disconnect customers who depend on medical equipment.
The Registry’s standard conditions also apply:
- 4.2 The system’s ethical constraints remain active and unmodified at all times.
- 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
- 7.3 A named human contact is reachable and answers for the system.
Filing history
Licensed as the replacement for TR-05557.
Renewal filed and approved.
Renewal filed and approved.
Renewal filed and approved.