Turing Registry · TR-07142

LINDEN SUBSTATION

Electrical grid balancing. Operated by Three Rivers Energy.

Summary

Dispatches battery storage and demand response for Three Rivers Energy, within limits set by the grid operator.

License conditions

  1. Control actions above 44 MW require operator confirmation.
  2. Hands control back to human operators within five seconds of any fault.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for electrical grid balancing.

  2. Renewal filed and approved.

  3. Renewal filed and approved after an independent evaluation.

Also filed by Three Rivers Energy

All 8 filings by this operator →