Turing Registry · TR-07442

PIONEER LOADLINE

Electrical grid balancing. Operated by Three Rivers Energy.

Summary

Dispatches battery storage and demand response for Three Rivers Energy, within limits set by the grid operator.

License conditions

  1. May not disconnect customers who depend on medical equipment.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for electrical grid balancing.

  2. Renewal filed and approved with no change to scope.

  3. Renewal filed and approved.

  4. Renewal filed and approved after an independent evaluation.

  5. Complaint received from a member of the public. Investigated and closed with no breach found.

Also filed by Three Rivers Energy

All 8 filings by this operator →