Summary
Dispatches battery storage and demand response for Southeast Power Cooperative, within limits set by the grid operator.
License conditions
- May not disconnect customers who depend on medical equipment.
- Hands control back to human operators within five seconds of any fault.
The Registry’s standard conditions also apply:
- 4.2 The system’s ethical constraints remain active and unmodified at all times.
- 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
- 7.3 A named human contact is reachable and answers for the system.
Filing history
Licensed for electrical grid balancing.
Renewal filed and approved.
Software update notified to the Registry. Scope unchanged.
Renewal filed and approved.
Renewal filed and approved after an independent evaluation.
A control action briefly exceeded its limit during a storm. Reported within 72 hours; no breach found.