Turing Registry · TR-11346

YAW 3

Wind farm operations. Operated by Heron Energy.

Summary

Schedules maintenance and curtails turbines during bird migration at Heron Energy sites.

License conditions

  1. May not exceed manufacturer load limits to increase output.
  2. Turbines curtail automatically when protected birds are detected nearby.

The Registry’s standard conditions also apply:

  • 4.2 The system’s ethical constraints remain active and unmodified at all times.
  • 6.1 Any incident affecting the system is reported to the Registry within 72 hours.
  • 7.3 A named human contact is reachable and answers for the system.

Filing history

  1. Licensed for wind farm operations.

Also filed by Heron Energy

All 7 filings by this operator →